Design-Build has become a very popular project delivery method for both the private and public sectors within the construction industry. As a modernized take on the “master builder” model that has served mankind for millennia, the contract creates a single entity that is responsible for the work on the project and with which the owner communicates.

Like every project delivery system, there are risk trade-offs. Owners who don’t fully understand the benefits and limitations of Design-Build could find themselves with a distressed project, subject to unexpected claims and litigation.

One concept that Owners often miss when getting involved in Design-Build is that if the contract fails to clearly articulate something that the Owner wants or needs, the Owner may be required to pay extra for it. This baffles even sophisticated Owners who enter into Design-Build agreements thinking that they won’t have change orders with this delivery method.

Owners may also discover that Design-Build contracts are much harder to unwind if the contractor fails to perform and if it becomes necessary to terminate the contractor. In the event of termination for failure to perform, who owns the design? Will the Owner be able to engage another architect to take over when the design concept was the basis of discretionary approval by the planning department? Or, does the non-performing contractor and his architect “own” the design? Having clarity over these issues is essential.

BASIS OF DESIGN

Design-Build can be a wonderful delivery method under the right conditions and with the right programming and Basis of Design (BOD) going in. The goal of the BOD is to concisely capture the owner’s requirements and vision into technical terms and design parameters the design-builder can work within.

Creating a quality Basis of Design greatly improves the communication and collaboration between the owner and builder, increasing the chances of success for the project. It does this by:

  • Communicating the owner’s vision of the project.
  • Ensuring the design-builder knows the project constraints to work within and where they can be creative.
  • Providing the criteria for owner and design-builder to resolve change order entitlement issues.
  • Serving as a key benchmark for proper evaluation and quick resolution if a dispute occurs.

In short, the Owner only needs to document in the BOD those things that are important to the Owner, because if it’s not articulated in the BOD, it’s left up to the contractor.

DEVELOPING A GOOD BASIS OF DESIGN

The most effective approach to a successful Design-Build project is for the Owner to directly hire the design consultants, building commissioning agent, and construction manager to perform programming and document a comprehensive BOD. This preliminary design work can include conceptual floor plans and elevations as well as performance-based project specifications. This approach secures for the Owner those things that the Owner cares most about—functionality, life-cycle considerations, and ownership of the design. It leaves to the design-build contractor those things that the construction team is best at—the selection of structural systems, construction details, and constructability.

By utilizing their experience and expertise, the programming team can help create a basis that is specific to the owner’s goals and feasible for the design-builder to construct within the contract’s budget. They can also provide a review of the design-builder’s final design to ensure that the Owner’s objectives have been met.

Related Articles

  • The Essential Place for Empathy in Construction Disputes 

    Several years ago, on a late evening flight to Dallas, we touched down in El Paso to drop off and take on passengers. The seat next to me had been left vacant by the deplaning passenger who sat next to me from San Diego, but was quickly filled by a clean cut young man in his late 20s with a white crew neck t-shirt, a brown leather bomber jacket, wire rimmed aviator glasses and hair cut “high and tight.”

    August 20, 2024
  • Sometimes “Time is Money” …but not always!

    The old adage that “Time is Money” has never been truer than as it relates to the development and construction of revenue producing properties. Between the Owner’s debt service expense on loans of tens of millions of dollars, lost revenue, and contractor’s time related costs, the cost per day can be tens of thousands of dollars.

    April 2, 2018

EXPERIENCE, YOUR BEST SOLUTION